Thames Water reveals further revision to proposed Teddington Direct River Abstraction scheme 17 Sep, 2024 Leave a comment 491 Views Design changes to Thames Water’s proposed Teddington Direct River Abstraction (TDRA) drought resilience scheme have been published following consultation feedback.