Design changes to Thames Water’s proposed Teddington Direct River Abstraction (TDRA) drought resilience scheme have been published following consultation feedback.
Tag Archives: Teddington Direct River Abstraction
Jacobs and Mott MacDonald appointed by Thames Water to London drought alleviation project
A Jacobs Mott MacDonald joint venture has been appointed by Thames Water to help develop proposals for new infrastructure to mitigate drought risk in London.
Thames Water reveals redesign for controversial Teddington drought alleviation scheme
Thames Water is updating the designs for its proposed Teddington Direct River Abstraction (TDRA) project following a community consultation late last year.