Bam has commenced construction of the €102M (£87M) Narrow Water Bridge in County Louth that will connect the Republic of Ireland and Northern Ireland.
Tag Archives: bam
Bam to carry out £5M clean up of historic waste deposits on Northumberland coast
Contractor Bam is preparing to begin a landmark scheme to clean up historic waste deposits that have been building up since the early 20th century on the coast in Northumberland.
UK Tier 1 contractors release manifesto urging government to ‘depoliticise infrastructure’
A group of 12 Tier 1 contractors have put together a manifesto urging the next government to “depoliticise infrastructure” among other recommendations to effectively boost the UK’s economic growth and productivity.
HS2 | Construction passes halfway on prefabricated 880m Thame Valley Viaduct
High Speed 2 (HS2) main contractor EKFB (Eiffage Kier Ferrovial Bam JV) has passed halfway in the construction of the prefabricated 880m Thame Valley Viaduct.
HS2 | Engineers complete 3,130t slide for second segment of Wendover Dean viaduct
Engineers from High Speed 2 (HS2) contractor EKFB (Eiffage Kier Ferrovial Bam) have successfully slid a 3,130t steel section of the Wendover Dean viaduct deck into position.
15 firms join Network Rail £3.5bn Eastern partnership to ‘streamline’ infrastructure works
Network Rail has announced 15 firms that make up a partnership to “streamline” delivery of £3.5bn of infrastructure works in the Eastern region during the five years of Control Period 7 (CP7), 2024-2029.
Foundation work begins on bridge to take A43 highway over HS2 railway near Brackley
High Speed 2 (HS2) main works contractor EKFB has begun construction of the foundations for a road bridge to take the A43 over the under-construction railway.
Underground construction of London’s £4.5bn Tideway super sewer complete
London’s new £4.5bn super sewer, Thames Tideway, has completed all construction with the lifting of a 1,200t concrete lid to cap off the project’s deepest shaft.
HS2 | Sliding of 320m double composite deck for Westbury viaduct commences
Engineers from EKFB (Eiffage Kier Ferrovial Bam JV) have commenced the sliding of the first section of the 320m double composite deck for High Speed 2’s (HS2’s) Westbury viaduct into position.
Bam to begin redevelopment of Tees Valley train station as new CGI released
Bam is gearing up to begin work on its redevelopment of Eaglescliffe station in the Tees Valley as a new CGI of how the station will look when completed has been released.