The M25 will be shut between junctions 9 (A243 Leatherhead) and 10 (A3 Wisley) from 9pm on Friday 10 May to 6am on Monday 13 May 2024 to allow engineers to install a new bridge and a gantry.
Tag Archives: atkinsrealis
Contract for tidal flood defence scheme in Belfast nearly doubles to £32.8M
The construction contract for the Belfast tidal flood defence scheme has ballooned in price to £32.8M following inflation and changes to the positioning of the defences.
Landslip-prone Northumberland road gets long term stabilisation solution
Developing a solution to secure the long term integrity of a landslip-prone section of the B6344 in Northumberland has required thorough ground investigations and several de-risking measures.
WSP and AtkinsRéalis to support nuclear waste geological disposal facilities programme
WSP and AtkinsRéalis have been appointed by Nuclear Waste Services (NWS) under a 10-year agreement to support its geological disposal facilities (GDF) programme.
Movers and shakers: Biggest construction and engineering appointments in February 2024
As everyone settles into 2024 some of the big engineering and construction firms have made big changes within their leadership teams.
Sizewell C early works to commence with site creation and ground trials
Work will soon be starting on work site creation and ground trials at the Sizewell C site.
AtkinsRéalis achieves top standard for work on equality, diversity and inclusion
AtkinsRéalis has been awarded the Clear Assured Platinum Standard by the Clear Company for its progress and impact with equality, diversity and inclusion (EDI) initiatives.
Thames Water announces major firms as technical partners on £300M framework
Thames Water has announced the three partners it has appointed to its £300M Technical Partner Framework for the delivery of its Strategic Resource Options (SRO) programme.
All-Ireland consortium appointed to infrastructure upgrade contracts by NI Water
An all-Ireland consortium comprising of Farrans, a joint venture between Tes and Celtic Anglian Water (Tes-Caw JV) and Aecom has been awarded a contract for early involvement in the upgrade of Northern Ireland (NI) Water’s assets.
‘Grim’ global warming figures are ‘clarion call’ for resilience to move up agenda, engineers warn
Engineers have said the revelation that global temperatures breached the 1.5°C global warming barrier must be a “clarion call that resilience has got to rise far higher up the global agenda”, otherwise the world is heading towards a “different evolutionary trajectory”.