bridge replacement | New Civil Engineer https://www.newcivilengineer.com Civil engineering and construction news and jobs from New Civil Engineer Tue, 17 Sep 2024 15:19:04 +0000 en-GB hourly 1 https://wordpress.org/?v=6.0 https://emap-romulus-prod.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/9/2023/07/favicon-nce192x-70x70.png bridge replacement | New Civil Engineer https://www.newcivilengineer.com 32 32 https://www.newcivilengineer.com/wp-content/themes/mbm-mops-2017/images/logo.gif New Civil Engineer https://www.newcivilengineer.com 125 75 Civil engineering and construction news and jobs from New Civil Engineer New 42m long bridge to be installed over M62 at Castleton in coming days https://www.newcivilengineer.com/latest/new-42m-long-bridge-to-be-installed-over-m62-at-castleton-in-coming-days-17-09-2024/ https://www.newcivilengineer.com/latest/new-42m-long-bridge-to-be-installed-over-m62-at-castleton-in-coming-days-17-09-2024/#respond Tue, 17 Sep 2024 15:19:04 +0000 https://www.newcivilengineer.com/?p=283646 Network Rail is to complete the second phase of its M62 Castleton bridge replacement this weekend.

The post New 42m long bridge to be installed over M62 at Castleton in coming days appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/new-42m-long-bridge-to-be-installed-over-m62-at-castleton-in-coming-days-17-09-2024/feed/ 0
M62 closures start this weekend for £22M post-tensioned railway bridge replacement https://www.newcivilengineer.com/latest/m62-closures-start-this-weekend-for-22m-post-tensioned-railway-bridge-replacement-06-09-2024/ https://www.newcivilengineer.com/latest/m62-closures-start-this-weekend-for-22m-post-tensioned-railway-bridge-replacement-06-09-2024/#respond Fri, 06 Sep 2024 13:01:10 +0000 https://www.newcivilengineer.com/?p=283267 The M62 motorway near Rochdale will undergo two full weekend closures starting this weekend as Network Rail’s £22M bridge replacement at Castleton gets underway.

The post M62 closures start this weekend for £22M post-tensioned railway bridge replacement appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/m62-closures-start-this-weekend-for-22m-post-tensioned-railway-bridge-replacement-06-09-2024/feed/ 0
Aecom to lead ‘resilient design’ on £401.1M dual bridge replacement in New York https://www.newcivilengineer.com/latest/aecom-to-lead-resilient-design-on-401-1m-dual-bridge-replacement-in-new-york-16-08-2024/ https://www.newcivilengineer.com/latest/aecom-to-lead-resilient-design-on-401-1m-dual-bridge-replacement-in-new-york-16-08-2024/#respond Fri, 16 Aug 2024 10:57:17 +0000 https://www.newcivilengineer.com/?p=282374 Aecom has been appointed lead designer for the replacement of two bridges along the Bronx River Parkway in New York.

The post Aecom to lead ‘resilient design’ on £401.1M dual bridge replacement in New York appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/aecom-to-lead-resilient-design-on-401-1m-dual-bridge-replacement-in-new-york-16-08-2024/feed/ 0
£19.5M project underway to replace ‘deteriorating’ road bridge in Leicestershire https://www.newcivilengineer.com/latest/19-5m-project-underway-to-replace-deteriorating-road-bridge-in-leicestershire-02-08-2024/ https://www.newcivilengineer.com/latest/19-5m-project-underway-to-replace-deteriorating-road-bridge-in-leicestershire-02-08-2024/#respond Fri, 02 Aug 2024 11:05:46 +0000 https://www.newcivilengineer.com/?p=281720 This week saw Eric Wright Civil Engineering commence work to replace a 90-year-old bridge on the Leicestershire-Nottinghamshire border.

The post £19.5M project underway to replace ‘deteriorating’ road bridge in Leicestershire appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/19-5m-project-underway-to-replace-deteriorating-road-bridge-in-leicestershire-02-08-2024/feed/ 0
Restoration of listed Victorian railway footbridge in East Yorkshire gets underway https://www.newcivilengineer.com/latest/restoration-of-listed-victorian-railway-footbridge-in-east-yorkshire-gets-underway-31-05-2023/ https://www.newcivilengineer.com/latest/restoration-of-listed-victorian-railway-footbridge-in-east-yorkshire-gets-underway-31-05-2023/#respond Wed, 31 May 2023 04:00:57 +0000 https://www.newcivilengineer.com/?p=261742 Work has begun on the repair and restoration of Beverley Bridge, a Grade II-listed structure at Beverley Station in East Yorkshire and one of only a handful of its type still in existence.

The post Restoration of listed Victorian railway footbridge in East Yorkshire gets underway appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/restoration-of-listed-victorian-railway-footbridge-in-east-yorkshire-gets-underway-31-05-2023/feed/ 0
Removal of Wiltshire road over rail bridge stalls due to technical challenges https://www.newcivilengineer.com/latest/removal-of-wiltshire-railway-bridge-stalls-due-to-technical-challenges-17-05-2023/ https://www.newcivilengineer.com/latest/removal-of-wiltshire-railway-bridge-stalls-due-to-technical-challenges-17-05-2023/#respond Wed, 17 May 2023 03:00:29 +0000 https://www.newcivilengineer.com/?p=260951 A Network Rail project to replace the St Margaret Street Bridge, a road over rail bridge in Bradford on Avon, faces continued delays after engineers discovered they were unable to remove dilapidated steelwork from the existing structure.

The post Removal of Wiltshire road over rail bridge stalls due to technical challenges appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/removal-of-wiltshire-railway-bridge-stalls-due-to-technical-challenges-17-05-2023/feed/ 0
Plans submitted for 200-year-old Essex bridge replacement https://www.newcivilengineer.com/latest/plans-submitted-for-200-year-old-essex-bridge-replacement-19-01-2023/ https://www.newcivilengineer.com/latest/plans-submitted-for-200-year-old-essex-bridge-replacement-19-01-2023/#respond Thu, 19 Jan 2023 03:30:15 +0000 https://www.newcivilengineer.com/?p=254787 Essex Highways has submitted its proposals for the replacement of the 200-year-old Finchingfield Bridge with a new structure for public consultation.

The post Plans submitted for 200-year-old Essex bridge replacement appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/plans-submitted-for-200-year-old-essex-bridge-replacement-19-01-2023/feed/ 0
Watch: Unlocking a transformative approach to bridge inspection https://www.newcivilengineer.com/latest/watch-unlocking-a-transformative-approach-to-bridge-inspection-11-12-2020/ https://www.newcivilengineer.com/latest/watch-unlocking-a-transformative-approach-to-bridge-inspection-11-12-2020/#respond Fri, 11 Dec 2020 16:30:24 +0000 https://www.newcivilengineer.com/?p=219938  This video was first broadcast at NCE’s Future of Transport conference 2020. In this session, WSP executive director and head of civil, bridge and ground engineering Steve Denton explores the industry’s current approach to bridge inspections, and the importance of understanding the rate of…

The post Watch: Unlocking a transformative approach to bridge inspection appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/watch-unlocking-a-transformative-approach-to-bridge-inspection-11-12-2020/feed/ 0
Lancashire bridge replaced as major works close railway https://www.newcivilengineer.com/latest/lancashire-bridge-replaced-as-major-works-close-railway-17-02-2020/ https://www.newcivilengineer.com/latest/lancashire-bridge-replaced-as-major-works-close-railway-17-02-2020/#respond Mon, 17 Feb 2020 00:39:55 +0000 https://www.newcivilengineer.com/?p=208129 A section of the East Lancashire rail line has closed for essential works to two bridges, and will remain closed for nine days.

The post Lancashire bridge replaced as major works close railway appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/lancashire-bridge-replaced-as-major-works-close-railway-17-02-2020/feed/ 0